Norfolk Terrace: Listed Building Restoration in Brighton

The client approached Grumitt Wade Mason to inspect the property and give an overview of how serious the problems were and the likely costs of repair.

Type of property:

A Grade II Listed Regency building converted into flats.

Location:

Brighton, East Sussex

Services provided:

  • Building pathology (defect diagnosis)
  • Refurbishment and restoration advice and planning
  • Measured surveys
  • Planning applications
  • Listed Building Consent
  • Detailed design for Building Control
  • Contract administration
  • CDM Coordination

Length of project:

Ongoing

Completion date:

February 2016 – but now working on additional internal improvements

What was the client looking for?

The client knew the building had fallen into disrepair and needed rather more than a little bit of TLC. The exterior of the building including the rear fire escape was in poor condition.

The Housing Department of Brighton & Hove Council had served an Improvement Notice on this listed building which means that if the client doesn’t take action, the council can do the work themselves and charge the owner. The owner then has no control over the work and it is likely to cost a lot more.

The client approached Grumitt Wade Mason initially to inspect the property and give an overview of how serious the problems were and the likely costs of repair. They wanted a ‘road map’ of how to

  • proceed with repairs
  • deal with the statutory authorities involved

Agreeing a budget

We set our fees for the initial inspection and advice.

Once we had established the extent of defects and the scale of repairs we set out further costs for building works and professional fees.

Statutory consents

The client needed Listed Building Consent and Building Regulation approval to remove the corroded metal fire escape which was in too bad a state to repair.

We then had to look into alternative means of escape and other fire precautions to make sure the occupants of the flats were safe.

Preparing a specification of works and tender

We have carried out surveys to assess the condition of the building, measured survey drawings, design drawings, plans and elevations. We have put together a detailed specification and contract conditions, and obtained competitive tenders from local building contractors.

Works have started on site.

 

Existing Rear Elevation

Existing Rear Elevation

Proposed Rear Elevation

Proposed Rear Elevation

What has Grumitt Wade Mason done so far?

  • Set out the issues and forecast budget in an initial report
  • Started further investigations and opening up
There had been damp ingress for a long time. Grumitt Wade Mason organised exploratory work to check for hidden defects such as timber decay. Fortunately, no significant areas of decay were found. This was a critical stage in the project as it helped us decide, before the client brought a contractor on board, whether repairs were needed to concealed and built-in timbers. This in turn allowed us to limit and manage the client’s risk before works started.
  • Produced detailed drawings of the doors, architraves, skirting boards and so on. Listed Building Consent demands a high level of detail in the drawings
  • Considered the implications of removing the fire exit, in particular, the need to block in any doors that opened onto the fire exit.
  • Prepared internal and external elevations to Listed Building Consent standards. Our experience of working on Listed Buildings helped the client obtain Listed Building Consent and Planning Permission Consent first time, avoiding costly delays.
  • Carried out major refurbishment works (more details below)

Photos from this project

Were there any challenges within this project?

Fire escape

The fire escape was heavily corroded. As the iron corroded, the expansion of the rust had caused cracking to the walls and water was getting in. To remove the fire escape we had to carry out a Fire Risk Assessment and improvements to the internal hallway to give a safe, protected means of escape internally.

Lath and plaster

Grumitt Wade Mason are experienced in specifying repairs to lath and plaster ceilings and wall linings.  Our understanding of how the building performs, as a whole, including breathability and ventilation means that we can recommend appropriate repairs.

What’s more, we are fully aware of the restrictions on Listed Buildings, making sure clients do not put themselves at risk of enforcement action or fines from the council for inappropriate works to a Listed Building.

Poorly designed alterations

Badly designed alterations to the roof were causing leaks and Grumitt Wade Mason have redesigned critical areas of concealed rainwater gutters to the roof.

Working in occupied buildings

The flats are all occupied and it is a challenge to keep residents informed.

Reflections on the project

The project is underway and progressing well.  Projects of this nature take time to look at all the options, obtain statutory consents and arrange for works to begin.

It is important to manage this process, minimising the client’s risk and exposure to claims for extra work from the contractor.  Grumitt Wade Mason have been working for the benefit of the client throughout this project and the building has already improved dramatically.

Although working through the winter is not ideal, all parties are fully aware of this and more time has been built into the programme.  When the works are complete, the outside of the building will be transformed and should require only routine maintenance, such as decoration, to keep the building in good order.